|
Build Your Online Product Catalogs?
Product Name: |
Rotary Drilling Rig
|
Supply Ability: |
|
Related proudcts |
|
Specifications |
HONGDA HDR200 piling rig |
Price Term: |
|
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
HONGDA HDR200 piling rig
1、Uses HONGDA HDR200 piling rig is an efficient boring rig in big-bore pile-base project construction, which mainly applies to such base constructions as railway,road,bridge, public works bridge and large building,etc.
2、Main technical parameters Max. drilling torque 200 kN.m Max. drilling diameter 2m Max. drilling depth 60m Max. lifting capacity of main windlass 210KN Max. lifting speed of main windlass 76m/min Max. lifting capacity of assistant windlass 98KN Max. lifting speed of assistant windlass 60m/min Driving force of pressurizing system 180KN Drawing force of pressurizing system 200KN Pressurizing stroke 5000mm Max. driving speed 1.5km/h Max. climbing grade 40% Engine rated power 246kw Engine rated rotating speed Overall weight 65t 3、Technical advantages: ℃ Efficient and energy-saving engine limit power regulating system supplies strong power. ℃ Double motor high-low speed power head ensures efficient drilling-in. ℃ Frictional and interlocking drilling rod are equipped with all kinds of slewing bucket and short or long optional helical bore and have drilling rod auto-assemble function. ℃ Retractable caterpillar chassis facilitates improving drilling work¨s stability and reducing transport width. ℃ Self-spelling folding drilling mast can realize conversion between working and transport condition without employing external force. ℃ Main and assistant windlass are arranged on turn table to improve its overall stability. ℃ Comprehensive numerical control slewing platform combined with parallelogram amplitude varying device makes boring tool position rapidly and accurately. ℃ Drilling depth and single drilling footage can automatically measure and display. ℃ A new drilling mast auto-adjusting electric control system not only control drilling mast¨s working position but also control its rising-and-falling process. ℃ Unique assistant |
Company: |
Shandong Hongda Construction Machine Co.,Ltd.
|
Contact: |
Mr. wu lei |
Address: |
No.26 Longmen Road, laiyang |
Postcode: |
265200 |
Tel: |
86 0535 7260997 |
Fax: |
86 0535 7260997 |
E-mail: |
|
|
|
|